Sari technical office
From site layout to washing system installation
A washing system project starts from real data: vehicles, manoeuvring spaces, washing frequency, utilities, accessories and water management. Sari turns these inputs into a technical configuration that fits the site.
Starting data
Effective planning starts from real operating needs
Planning is not only about the portal or the washing bay. Each choice affects daily use, maintenance, vehicle flows and future service.
Vehicles to wash
Trucks, buses, special vehicles, mixed fleets and irregular shapes require different evaluations.
Available area
Access, manoeuvring radius, technical room, drainage and tanks must be read together.
Use frequency
Repeated cycles, self-service use and manual washing require different configurations.
Water management
Treatment, recovery, tanks and operating continuity need to be part of the project from the start.
Automation level
Portal, high pressure, arms, programs and accessories are selected around real work conditions.
Future service
The system must remain clear, maintainable and serviceable after start-up.
Method
From first review to installation
The page helps qualify the request: the clearer the technical inputs, the more concrete the proposal can be.
Technical review
Collecting information on vehicles, site, washing frequency, objectives and operating constraints.
System project
Defining layout, washing system, accessories, technical room and water treatment.
Installation
Coordinating configuration, installation, connections and commissioning.
Service
Technical support to keep the system operating and manageable over time.
Custom washing systems
Washing, space and water must be planned together
For trucks, heavy vehicles and fleets, washing and water treatment are not separate topics. Bay layout, access points, utilities, tanks and treatment affect the entire system. Sari evaluates the installation as a whole, not as a set of isolated machines.
Related solutions
Useful pages to define the project
Planning can start from a specific application or from an operating constraint: vehicle type, shape, washing frequency, available space or water management.
Technical questions
What to clarify before the request
Is planning only for new systems?
No. It can also support existing installations, layout updates, accessory integration or water management reviews.
Which data helps a first review?
Vehicle types, site dimensions, access points, washing frequency, available utilities, automation goals and water treatment needs are useful.
Should water treatment be considered from the beginning?
Yes. Tanks, recovery, purification and discharge affect layout, operating continuity and maintenance.
Does Sari also handle installation?
Yes. Planning is connected with production, installation, commissioning and technical support.
Technical request
Do you have a washing area or system to define?
Prepare the main details about vehicles, space, access and water management: the technical discussion will be clearer and more useful.



